Latest Headlines from Nourish | The Nourish Mission

Nova Block 2 aims to lift 15 tons in reusable form

What's happened

Stoke Space has raised $2.3 billion in a Series E round led by Point72 Ventures and Spark Capital, enabling accelerated development of the Nova rocket family. Pathfinders are moving toward early 2027 launches, with Block 2 planned to lift 15 metric tons to LEO using methane-LOX and a larger diameter. Upper and lower stages are undergoing ground tests, with Florida and Moses Lake facilities central to the rollout.

What's behind the headline?

Key questions for readers

  • What does the funding mean for small-launch competition?
  • How will Nova Pathfinder and Block 2 compare to rivals like SpaceX and Rocket Lab in terms of payload and cost?
  • What are the technical risks tied to a fully reusable, methane-LOX system?

What’s next

  • Ground tests on the first stage are wrapping up, with hot-fire and structural testing continuing at Moses Lake and Cape Canaveral.
  • A target launch window for early 2027 is being pursued, but authorities warn milestones in rocketry testing are prone to slips.

Why it matters

  • A successful Nova family could reshape the small-launch market, offering high cadence and rapid reflight for satellite deployments.

How we got here

Stoke Space, founded in 2020, has been private about its broader roadmap until now. The Series E funding signals strong investor confidence as Stoke pursues a fully reusable small launcher capable of rapid reflight. The Nova program includes a 3-ton Pathfinder and a 15-ton Block 2, both using Zenith methane engines and a regeneratively cooled heat shield for reentry.

Our analysis

Ars Technica reports Stoke Space is pursuing a larger Nova vehicle, with a 7-ton initial expendable/3-ton reusable Pathfinder and a Block 2 version designed for 15 tons to LEO. The round, led by Point72 Ventures and Spark Capital, brings total funding to $2.3 billion. The company plans to ship the first stage for testing at Cape Canaveral and Moses Lake, with staged hot-fire tests ahead of a claimed early-2027 launch.”

Go deeper

  • What does this funding unlock in practical terms for customers?
  • Which customers are already in Stoke’s pipeline?
  • Will the industry see faster reflight times as a result?

More on these topics


Latest Headlines from Nourish | The Nourish Mission